CMGT 110-01
🇬🇧
In English
In English
Practice Known Questions
Stay up to date with your due questions
Complete 5 questions to enable practice
Exams
Exam: Test your skills
Test your skills in exam mode
Learn New Questions
Manual Mode [BETA]
The course owner has not enabled manual mode
Specific modes
Learn with flashcards
multiple choiceMultiple choice mode
SpeakingAnswer with voice
TypingTyping only mode
CMGT 110-01 - Leaderboard
CMGT 110-01 - Details
Levels:
Questions:
86 questions
🇬🇧 | 🇬🇧 |
Allowance | A specific sum of money set aside in a construction contract to accomplish something that has not been specified exactly yet. |
The plan view | The top view of a form |
The elevation view | The front or side view of a form |
The perspective view | Represents what our eye sees |
The isometric view | 3D with no perspective |
Dashed lines in a projected drawing of a 3D form indicate | Edges that are hidden behind other surfaces |
SketchUp produces _ models. (3) | Solid, edge, and surface |
In SketchUp the model is created with _. (2) | Lines and surfaces |
In SketchUp layers are used to _. (3) | Organize model content, view model content, lock model content |
In SketchUp 'entity information' is used to _. | View information about the model content |
In SketchUp the 'Scenes' are used to _. (3) | View specific model content, edit specific model content, create a 'movie' |
An admixture is a substance added to (4) | A concrete mix, delay the setting of a mix, change the color of a mix, alter the behavior of the mix |
The purpose of a footing or foundation is to _. (3) | Transfer the building load into the earth, spread the building load out over a larger area, keep the building from settling |
The centering of an arch or vault is _. | The framework for the structure |
The substructure of a building is _. | The structure below the ground |
The North elevation of a building _. | Faces North (from the inside) |
The purpose of an acoustical ceiling is to _. (4) | Show an exposed grid, be suspended from the structure above, reduce sound reflection in a space, lower the ceiling in the space |
The term 'existing grade' refers to _. (3) | The level of the soil before any construction takes place, the final levl of the soil around a project, the existing landscaping |
An easement is _. | A legal restriction on a piece of property |
A section view | A vertical plane cut through an object |
A dead load consists of the weight of _ in a building. | The construction & permanently installed materials/equipment |
A rule used to scale plans using the Imperial system is called _. | An architects scale |
Bridging is _. | Cross bracing between joists |
The differences between the construction drawings and construction documents is the _. | Specifications |
If a material is impervious, it | Doesn't allow objects to pass through |
If a material is inert, it | Wont react |
Vitruvius' definition of architecture uses 'firmness' to mean _. | Structural soundness |
The exterior of a building, its walls and roof are often referred to as its _. (2) | Superstructure, shell |
Our classroom has a(n) _ ceiling. | Acoustical exposed grid |
The plan view | The top view of a form |
The elevation view | The front or side view of a form |
A perspective view | Looks much like our eyes see it |
The text dimensioning on a drawing should ALWAYS read to the _ side when viewing the drawing right side up. | Bottom or right |
A live load consists of the weight of _ in/of a building | The contents that are movable |
An easement is sometimes called _. | A right of way |
The plan view | The top view |
The section view may consist of (3) | A plan view, a horizontal cut through the form, a vertical cut through the form |
A space under a floor | Crawl space |
The corners of adjacent walls are tied together through the use of a _ in the wall framing. | Double plate |
A crawl space under a floor is typically used for _. | Access to utilities |
The _ may be used to attach a framed wall to the foundation of a structure. | Anchor bolt or holddown |
A subfloor is the _. | The base for the finish floor |
The recipe for the combination of cement, course and fine aggregates and water is called the _. | Concrete mix |