SEARCH
You are in browse mode. You must login to use MEMORY

   Log in to start

level: NoGo Criteria for Building Infra

Questions and Answers List

level questions: NoGo Criteria for Building Infra

QuestionAnswer
Ceiling BoardsSagging boards, water mark stains, dislodged/loose boards
DoorsDislodged Doors, Broken Door Hinges, Termite Infested Door and/or door frame
FansBroken Blade, Missing Cover, Loose fitting, dislodge, dangling wires
LightsExposed Wiring, Loose fitting, damaged fixtures, hanging from ceiling. faulty emergency exit light
RoofWater Leakage, Sagging or dropping of the plasterboard sheeting/zinc roof. Broken roof structures
ToiletsBroken fitting, choked urinal/WC
Wall SocketsBroken switches, overloading socket, burn mark sign, loose/exposed wire
WindowsMissing screw/rivets, loose screw/rivets, dangling/loose panel, crack panel