What is the design process of buildings (8 steps)Concept design -> Preliminary design and drawings -> Client and statutory approvals -> Technical drawings -> Tender documents -> Appointment of contractors -> Construction -> completion
Explain the concept of sustainable buildings-High performance -High efficiency of water, energy-use -Reduce waste, pollution and environmental degradation -Protect occupant health, improve human productivity -Reduce overall impact on the environment
What are the 5 key factors of the traditional design process-Development is a linear process -Isolated project disciplines -Infrequent involvement of stakeholders -Preliminary planning -High risk
What are the 5 key factors of the Integrated design process-Developement is an interative process =Integrated project disciplines -Continuous involvement of stakeholders -Accurate planning -Reduced risk
What are some sustainable building materialsrubber, bamboo, clay, timber
What is warmcell insulation?Insulation made of natural cellulose fibre base (recycled newspaper that has been shredded, milled and mixed with mineral additives) that is installed between battens, roofs for a warm loft space.
What are 6 concrete frame structures?Columns, beams, slabs, Foundations, shear walls, Elelevator shaft
What are the steps for project development-Realizing the need -Determining technical and financial feasibility -Preparing detail plans, specification, cost estimates -Obtaining approval
What are the steps in construction contracting process-Bid requirement -Bid preparation -Bid submission -Contract award -Contract administration