Question:
Multiple predetermined overhead rates
Author: Christine HenningAnswer:
A costing system with multiple overhead cost pools and a different predetermined overhead rate for each cost pool, rather than a single predetermined overhead rate for the entire company. Each production department may be treated as a separate overhead cost pool.