Question:
All changes that enter into a project are recorded in the change log. The characteristics of the change, such as the time, cost, risk, and scope details, are also recorded.
Author: Mitch PalmerAnswer:
Change log
0 / 5 Â (0 ratings)
1 answer(s) in total