Question:
A predetermined range of acceptable variances, such as +/–10 percent off schedule. Should the variance exceed the threshold, then project control processes and corrected actions will be enacted.
Author: Mitch PalmerAnswer:
Control threshold
0 / 5 (0 ratings)
1 answer(s) in total
Author
Mitch Palmer