Question:
An approach using a parametric model to extrapolate what costs will be needed for a project (for example, cost per hour and cost per unit). It can include variables and points based on conditions.
Author: Mitch PalmerAnswer:
Parametric estimating
0 / 5 Â (0 ratings)
1 answer(s) in total