Question:
This rough estimate is used during the initiating processes and in top-down estimates. The range of variance for the estimate can be from –25 percent to +75 percent.
Author: Mitch PalmerAnswer:
Rough order of magnitude
0 / 5 (0 ratings)
1 answer(s) in total