Question:

PRELIMINARY HAZARD ANALYSIS (PHA): USES:

Author: LEIGHTON DWIGHT OBILLOS



Answer:

1 useful when analyzing existing systems or prioritizing hazards where circumstances prevent a more extensive technique from being used. 2 used to evaluate the types of hazards for the general product type 3 used early in the development of a project when there is little information on design details or operating procedures.