Question:
Ideally, evaluation is done:
Author: James Marion Endrina EnticeAnswer:
Periodically during mobilization (i.e., formative evaluation) to allow revision of strategies when needed and at the end of the prescribed project period (i.e., summative evaluation)
0 / 5 Â (0 ratings)
1 answer(s) in total