Question:
Maintenance schedule for cargo handling equipment
Author: Sophie MarchAnswer:
1. all grease nipples attended to weekly. 2. inspection of ancillary equipment every 3 months. 3. thorough inspection and stripping of equipment mentioned above every 6 months. 4. lifting appliances should be de-rusted, overhauled, and painted every 12 months. 5. ALL EQUIPMENT SHOULD BE INSPECTED BEFORE, DURING, AND AFTER USE.
0 / 5 Â (0 ratings)
1 answer(s) in total